Integrated Logistics Solution for Aerial C4ISR Platform

October 27, 2016 - By thinkitfirst

Army was tasked with transitioning QRC into POR

PM Fixed Wing and PM Sensor Aerial Intelligence had a requirement for the integration and system validation of four Aerial ISR platforms.

The Lockwood Group meets the demand to transition system in accordance to Army Program of Record standards

The Lockwood Group’s Integrated Logistics Support team is developing an end to end Integrated Logistics Solution to ensure a Mission Ready system for future EMARSS operators and maintainers. In accordance TLG is developing all Technical Manuals, Training Materials, Provisioning and Logistics Products to ensure The Lockwood Group has delivered a fully sustainable system for the Warfighter. TLG’s ILS team has met all deliverable milestones on the program.

ADVANCE YOUR CAREER AT THE LOCKWOOD GROUP

Search TLG careers to discover new and rewarding opportunities for qualified candidates.

VIEW JOBS